e-ID Login Terms and Conditions


More Options

ERA Logo
  • Login
  • MT
Home To-Do List Active Cases Search Case Environmental Permit Application Draft List
Details

Case Details

Application Status
Case Status
Consultation

Application Details
Case No
IP 00003/25
Location Of Development
Church Wharf, , Marsa, MRS 1571
Description Of Works
1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).
1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).
1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).
1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).
Applicant
Reception Date

Initial Processing
Target Date
Application Type
Environmental Permit
Case Category



eCommunicationPolicy CookiePolicy PrivacyPolicy Terms And Conditions
eCommunicationPolicy CookiePolicy
PrivacyPolicy Terms And Conditions