Location Of Development
Church Wharf, , Marsa, MRS 1571
Description Of Works
1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).1.42 - Operations falling within scope of Schedule 1 of the Industrial Emissions (Integrated Pollution Prevention and Control) Regulations (S.L. 549.77) and the Industrial Emissions (Framework) Regulations (S.L.549.76).